A demonstration in our yard proves that the robot walks. A proof of concept on your route proves that it does your job: your stairs, your panels, your thresholds, your systems. Two formats, fixed prices, acceptance criteria written down before we start.
Runs on a DEEP Robotics quadruped — X30 Pro or Lynx M20, carrying the sensing pack — thermal PTZ, acoustic, gas, RTK. Authorised DEEP Robotics distributor in the UAE.
Book a POC dateReplies on WhatsApp, same day
Format 1 — proof of concept
Day 1: induction, route walk with your team, mapping, sensor check, first full round.
Day 2: second round on the same route, side-by-side comparison, exceptions reviewed with your engineers, report and data sample handed over in your format.
Included: robot with the standard sensor set, two operators, transport within the UAE, the report within 48 hours, a one-hour debrief.
Credit: the POC amount is deducted from a service contract or a robot purchase signed within 90 days.
Abu Dhabi, Al Ain and the Western Region: travel is included; remote sites are quoted with accommodation.
Format 2 — four-week pilot
Week 1: survey, mapping, dock installation, criteria signed. Weeks 2–4: rounds on your schedule — typically one to three per day — with weekly reviews.
Integration into one system of your choice (BMS, DCIM, CMMS or historian) through an API, so alarms and work orders appear where your team works. See integration.
Hand-over: evaluation against the signed criteria, cost per round, and a proposal for purchase or continued service. The pilot fee is credited against an order within 90 days.
The exact figure depends on the sensor set, the number of rounds and the site; the pilot is confirmed with a written scope and a 50% deposit.
What we need from you
A contact who owns the evaluation criteria and signs them before day one.
Access: visitor induction and passes for two operators, escort rules, no-photo zones listed.
A route of up to about 3 km per round with a 230 V socket for the charging dock.
Your checklist or at least the list of points and acceptable ranges.
For integration: a test endpoint or an export format and a person on your side who can confirm the data arrived.
How acceptance is judged
Coverage: share of checklist points reached and read on every round.
Repeatability: readings at the same point across rounds within the agreed tolerance.
Delivery: report within 48 hours; data visible in your system within the agreed time.
Safety: zero incidents, every stop and manual intervention logged.
Each criterion has a number agreed in advance; the evaluation lists the number achieved. No criterion, no pilot.
Next step
Send the location, the rooms or zones, and what your checklist asks for; we reply with a scope and a date. Book a POC date
Updated 15 November 2026. Prices in AED exclude 5% UAE VAT and cover sites within the UAE.